Raynor Company Group had the honor of creating the new Cathedral for the St. Verena Coptic Orthodox Church from August of 2018 until June 1st of 2019.

 

Raynor Company Group had to install new exterior metal stud framing and sheathing at the new Cathedral which included numerous dome and groin ceilings, as well as intricate wall features profiles.

 

Raynor Company Group installed a Titan stucco system with a full Dryvit EIFS system at all banding and cornice locations of the exterior walls with Dryvit acrylic finish at the stucco locations.  The exterior vaulted groin ceilings were installed by shaping the foam to the profile of the groins and completing them with a Dryvit EIFS system.

 

Raynor Company Group completed the interior scope of work consisting of new framing and drywall of partitions, soffits, and ceilings at the Cathedral building. The interior scope also included numerous vaulted groin and dome ceilings that were achieved by a combination of USG suspended drywall grid and metal stud framing and GFRG domes. A level 5 finish was provided at all drywall locations within the Cathedral through numerous hours of laser set cornerbeads and mopping of walls.  

 

As a result of strong emphasis to safety, Raynor performed this scope without a single lost time recordable accident. Raynor Company Group has exceeded its own expectations in completing this challenging project, honored to be a part of and will remember this opportunity to create an improved shrine for the parishoners of St Verena‚Äôs to worship.  